School Board Approves Electrical Assessment At SBHS

School Board Approves Electrical Assessment At SBHS

Sturgis News
By Brandon Bennett
STURGIS— The Meade 46-1 school board approved a proposal from West Plains Engineering for an electrical assessment at Sturgis Brown High School at its meeting July 13.
West Plains Engineering has submitted a proposal in the amount of $6,500 to conduct an electrical assessment at SBHS. The assessment will evaluate the building’s electrical service, emergency power systems, generators, automatic transfer switches (ATSs), and electrical distribution at the panelboard level to determine the facility’s ability to maintain essential heating systems during power outages.
The proposal was approved.

Leave a Reply

Your email address will not be published. Required fields are marked *